Backfill operation deparment (BOD) Established in 1966 ã.
Primary activities:
– casings cementing and placing of cement plugs;
– hydraulic jet perforating;
– preparation, recovery, storage, transportation of drilling mud and process liquids;
– monitoring and drilling mud consistency control during well drilling and recovery;
– well processing for removal of asphaltic-resinous paraffin deposits (ASPD) and well processing using fresh water for desalination;
– hydrochloric-acid and hydraulic reservoir fracturing;
– well development operations using a nitrogen compression unit. Cooperation geography: Russia. Head of BOD – Zavyalov Aleksandr Borisovich. |