Drilling waste utilization

The well construction technology stipulates the arrangement of sludge pits for drilling waste accumulation and their further utilization.

The underground industrial storage facility with volumetric capacity of over 200 000 m3 for throwing off slurry drilling waste, which is available at Svetlogorsk Drilling Operations Department, allows to drill wells using pitless drilling waste utilization method.